Automotive Paint Spraying Process
INTRODUCTION
Paint spraying within automotive body shops presents one of the highest fire and explosion hazards encountered within motor trade occupancies. The combination of flammable liquids, volatile solvent vapours, combustible overspray deposits, ignition sources and heated drying processes creates the potential for significant property damage and serious injury.
While modern water-based paints have reduced solvent content, many automotive refinishing processes continue to utilise flammable thinners, cleaners, hardeners and polyurethane clear lacquers. Importantly, water-based coatings can still generate combustible overspray residues and present fire hazards during spraying and curing operations.
MATERIAL STORAGE AREAS
Material storage areas contain a combination of flammable and non-flammable liquids, and typically hold a large fire load.
Storage controls should apply not only to paints and thinners but also to all associated refinishing materials, including primers, hardeners, catalysts, cleaning agents, degreasers, aerosols and waste products, as these can contribute significantly to the overall fire, explosion and environmental risk presented by the operation. Controls should include:
Segregated flammable liquid storage.
Quantities restricted to operational needs.
Separation from ignition sources.
Good stock control and housekeeping.
Fire-resisting construction for dedicated stores where significant quantities are held.
Spill containment provisions.
PAINT MIXING ROOMS
The paint mixing process involves the use of flammable and hazardous materials that can create explosive atmospheres, health risks and significant fire loading. Hazards include:
Release of flammable solvent vapours.
Ignition from electrical equipment.
Static discharge during transfer and mixing.
Spills leading to fire spread.
Exposure to solvents and isocyanates.
Storage of excessive quantities of paints, thinners and hardeners.
Appropriate design, ventilation, storage, housekeeping and operational controls are therefore essential to reduce the likelihood of fire, explosion, environmental contamination and employee injury. Controls include:
Dedicated paint-mixing room separated from production areas.
Non-combustible construction where practicable.
Mechanical extraction ventilation.
Suitable hazardous area classification.
Ex-rated electrical installations where required.
Bonding/earthing of containers during transfer.
Limited stock quantities maintained at point of use.
Storage of bulk flammable liquids within approved flammable liquid cabinets or stores.
Spill kits and documented spill-response procedures.
COSHH assessments for all paints, hardeners, lacquers and solvents.
PAINT SPRAY BOOTHS
The primary purpose of a spray booth is to:
Contain overspray.
Control the spread of flammable vapours.
Protect operators from exposure to hazardous substances.
Prevent contamination of surrounding work areas.
Reduce the likelihood of fire and explosion.
Provide controlled drying and curing conditions.
A spray booth should be regarded as an engineered safety system, not merely a workspace.
PRINCIPAL HAZARDS
Flammable Vapour Formation
Paints, lacquers, thinners and cleaning solvents release combustible vapours during application and drying. Spraying significantly increases the surface area of the liquid, accelerating solvent evaporation and increasing the likelihood of a flammable atmosphere developing.
Potential consequences include:
Flash fire
Explosion
Rapid fire development
Extensive smoke damage
Lacquer Application
Automotive clear coats and lacquers typically contain:
Acetone
Xylene
Toluene
Ethyl acetate
Polyurethane resins
Isocyanate hardeners
The application of lacquers frequently represents the highest fire and health risk, with hazards including:
High vapour generation
Flammable solvent release
Isocyanate exposure
Exothermic curing reactions
Contaminated waste accumulation
Isocyanate Exposure
Many 2K lacquer and clear coat systems contain isocyanates. Exposure may occur through:
Inhalation
Skin absorption
Contaminated clothing
Health effects include:
Occupational asthma
Respiratory sensitisation
Chronic respiratory disease
Once sensitised, workers may react to extremely low future exposures.
For this reason, positive-pressure air-fed breathing apparatus should be used when spraying isocyanate-containing paints and lacquers.
Overspray Deposits
Paint and lacquer particles accumulate on:
Booth walls
Lighting units
Extraction plenums
Filters
Ductwork
Overspray residue constitutes a combustible fuel source and can support significant fire spread.
Static Electricity
Static electricity may be generated by:
Atomisation processes
Air movement
Paint transfer systems
Vehicle surfaces
An electrostatic discharge may ignite solvent vapours.
Controls should include:
Earthing
Bonding
Anti-static footwear
Grounded spray equipment
SPRAY BOOTH CONSTRUCTION REQUIREMENTS
Booth Construction
Spray booths should be constructed from non-combustible materials. The following should be avoided:
Timber construction
Combustible linings
Composite panels containing combustible insulation
Location
Where practical, spray booths should:
Be separated from production areas.
Be located against an external wall.
Not be installed below ground level.
Allow direct discharge of extracted air to atmosphere.
High-value or high-throughput operations may warrant dedicated fire-resisting spray areas.
Booth Layout
Booths should be designed to:
Promote uniform airflow.
Eliminate stagnant areas.
Prevent overspray accumulation.
Facilitate cleaning and maintenance.
Surfaces should be smooth and easy to clean.
VENTILATION REQUIREMENTS
General
Ventilation is the most important safeguard against vapour accumulation. Its purpose is to:
Maintain solvent concentrations well below flammable limits.
Protect worker health.
Remove overspray.
Support drying processes.
Best practice is to design ventilation systems so flammable vapours remain below 25% of the Lower Explosive Limit (LEL).
Interlocks
Spraying equipment should not operate unless ventilation is proven operational.
Recommended interlocks include:
Airflow switches
Differential pressure monitoring
Fan running status monitoring
Exhaust Systems
Exhaust systems should:
Discharge externally.
Be independent where possible.
Minimise bends and restrictions.
Prevent recirculation of contaminated air.
Air intakes should be positioned so that extracted solvent vapours cannot re-enter the building.
Clearance Time
Spray booth clearance times should be established, displayed and observed before operators remove respiratory protection or enter the booth following spraying.
Spray Booth Performance Verification
Spray booths should be commissioned, tested and maintained to ensure effective control of vapours and overspray. Airflow performance, pressure monitoring, filter condition and clearance times should be verified and documented. Any deterioration in performance should be investigated and corrected before spraying activities continue.
DRYING & BAKING HAZARDS
Overview
The drying phase is frequently overlooked but remains a critical fire risk. Fresh coatings continue releasing flammable vapours during:
Flash-off periods
Heated bake cycles
Infrared curing
The highest risk often occurs when heat is introduced while solvents continue evaporating.
Heated Booths
Most automotive booths utilise:
Gas-fired burners
Diesel-fired heaters
Electric heaters
Infrared systems
Hazards include:
Ignition of solvent vapours
Equipment malfunction
Overheating
Fire spread
Booth heating systems should be interlocked with extraction systems.
Combination Spray/Bake Booths
Combination spray and bake booths are common within body shops. Safe operation requires:
Spraying and heating systems to be interlocked.
Heating to be disabled during spraying.
High temperature cut-outs.
Temperature monitoring systems.
Automatic shutdown arrangements.
Drying systems should be fitted with independent high-temperature cut-outs in accordance with the manufacturer's recommendations and recognised standards.
Infrared Drying Equipment
IR systems should:
Be maintained in accordance with manufacturer instructions.
Be positioned clear of combustibles.
Never be left operating unattended.
Be inspected regularly for damage.
No matter the type of baking/drying used, it should never be an unattended process (out of business hours) unless agreed/approved by the insurance company.
FIRE PROTECTION
Automatic Fire Detection
Automatic fire detection should be provided within:
Spray booths
Mixing rooms
Drying areas
Solvent stores
Connection to a monitored alarm receiving centre is recommended.
Sprinkler Protection
It is strongly recommended to have automatic sprinkler protection within spray booths and associated spray areas. The LPC Rules for Automatic Sprinkler Installations incorporating BS EN 12845 classifies paint spray booths and associated process areas as High Hazard Process (HHP). Protection should include:
The spray booth itself
Booth plenums
Extract chambers
Concealed combustible spaces
Areas above booths
Special arrangements may be required to prevent overspray contamination of sprinkler heads.
Portable Fire Extinguishers
Suitable extinguishers should be readily accessible, including:
Foam
CO₂
Dry powder (where appropriate)
Personnel should receive training in their use.
Ignition Source Control
The following should be prohibited within spray booth areas:
Smoking
Naked flames
Portable heaters
Hot work
Non-approved electrical equipment
Surfaces within hazardous areas should not present an effective ignition source for the materials in use.
HOUSEKEEPING
Poor housekeeping remains a common cause of spray painting fires. Control measures should include:
Metal waste containers with metal lids for disposing of contaminated wipes/rags within process areas.
Removal of contaminated wipes/rags and all combustible waste to external dedicated storage containers at the end of each day.
Segregation of hazardous waste streams.
Scheduled disposal arrangements.
Prevention of residue accumulation on all surfaces and within extraction systems. Deposits on any surface should not exceed approximately 3 mm in thickness, and corrective maintenance should be undertaken if overspray accumulation becomes excessive.
A formal cleaning programme should include:
Daily
Booth floors
Waste containers
Mixing areas
Weekly
Filters
Lighting assemblies
Extraction chambers
Monthly
Ductwork inspection
Fan inspection
Plenum inspection
MAINTENANCE & TESTING
A documented maintenance programme should include:
Daily
Airflow checks
Housekeeping inspections
Equipment condition checks
Weekly
Earthing verification
Filter inspections
Waste management inspections
Monthly
Ventilation testing
Fire protection inspections
Ductwork inspection
Annually
Thorough examination of ventilation systems (at interval not exceeding 14 months)
DSEAR review
Interlock testing
Heating system servicing
CONCLUSION
Automotive paint spraying operations present significant fire, explosion and occupational health hazards arising from the use of flammable liquids, combustible residues and hazardous substances such as isocyanates. Effective risk control requires a combination of engineering controls, management systems and safe working practices.
Particular attention should be given to the design and operation of spray booths, ventilation performance, hazardous area classification, housekeeping, fire protection systems and the safe handling and storage of paints, solvents, lacquers and waste materials. Ancillary activities including paint mixing and material storage should be subject to the same level of risk assessment and control as the spraying operation itself.
Facilities should operate in accordance with applicable legislation, including DSEAR and COSHH, and should adopt recognised industry guidance and standards for spray booths, drying equipment and potentially explosive atmospheres. Regular inspection, maintenance and testing of ventilation systems, fire protection systems and safety interlocks are essential to ensure continuing effectiveness.
Where the controls outlined in this bulletin are implemented and maintained, the likelihood of fire, explosion and harmful employee exposure can be significantly reduced, resulting in safer operations, improved resilience and reduced property and business interruption losses.
REFERENCES
The Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR). Health and Safety Executive.
Control of Substances Hazardous to Health Regulations 2002 (COSHH).
Regulatory Reform (Fire Safety) Order 2005 and equivalent fire safety legislation in Scotland and Northern Ireland.
HSG276: Isocyanate Paint Spraying - Safely Managing Spray Booths and Rooms, Health and Safety Executive.
HSG261: Health and Safety in Motor Vehicle Repair and Associated Industries, Health and Safety Executive.
BS EN 16985:2018 - Spray Booths for Organic Coating Material. Safety Requirements. This standard supersedes earlier booth standards and represents current good practice for spray booth safety.
EN 1539 - Dryers and Ovens in Which Flammable Substances are Released. Safety Requirements.
BS EN 60079 Series - Explosive Atmospheres, including inspection and maintenance requirements for hazardous area electrical installations.
LPC Rules for Automatic Sprinkler Installations Incorporating BS EN 12845.
HSE Guidance on Electrical Equipment in Potentially Explosive Atmospheres.